As we approach peak trading period in 2025, Savvy will have a production change freeze in place from 19/11/25 to 11/1/26 inclusive.
- No system changes or new deployments are feasible during this time period.
- Our test environment will remain fully operational throughout this time and is unaffected by the Production environment change freeze.
- Our ongoing performance testing programme ensures we are scaled materially above peak demand volumes including new customers on-boarded this year
- Customer and Technical Support desks operate normally throughout peak period.
The above is applicable to all Savvy hosted clients as part of our multi tenant single instance SaaS platform design.